SOF Phase 4
Ft Campbell, KY - In Progress

Contract Amount -
Description-

(Click for more photos)
OMA Repair Relocatables
Ft Jackson, SC - In Progress

Contract Amount -
Description-

(Click for more photos)
2nd BCT
Ft Campbell, KY - 2010

Contract Amount - $45,448,655.00
Description- Design and Build Tactical Equipment Maintenance Facilities, consisting of six Maint. buildings and associated storage buildings, over 1,000,000 sq feet of concrete paving, and associated site and utility work

(Click for more photos)
108th ADA TEMF Complex
Ft Bragg, NC - FY2010

Contract Amount - $38,453,463.00
Description- Design and Build a Tactical Equipment Maintenance Facilities consisting of a Large Vehicle Maintenance Shop and associated buildings with approximately 58,000 SY of concrete paving and grading work to incorporate the whole 108th ADA complex that was being constructed by another contractor

(Click for more photos)
RSTB
Ft Benning, GA - 2010

Contract Amount - $23,943,009.00
Description- Design and construct Bn HQ/HHC Company Operations Facility, a Company Operations Facility, a Tactical Equipment Maintenance Facility, grading, concrete paving, access roads, sidewalks, water, sewer, storm drainage, erosion control measures, underground measures, underground electrical service, and landscaping.

(Click for more photos)
3rd BDE Barracks Complex
Ft Bragg, NC - 2009

Contract Amount - $86,374,675.00
Description- New construction of the 3rd Brigade Barracks Complex consists of the first two six story barracks on Ft. Bragg, two large COF’s, two quad COF’s, and two battalion headquarters as well as site preparation and development and undercut excavation. This project was comprised of 13 hundred tons of steel, masonry walls, pre-engineered buildings and underground utilities.

(Click for more photos)
96 Man Barracks
Hunter Army Airfield, GA - 2008

Contract Amount - $10,417,175.00
Description- This project involved the design and construction of one multi story barracks building of approximately 35,000 square feet. Including access roads, sidewalks, water, sewer, storm drainage, erosion control measures, underground measures, underground electrical service and landscaping. This Facility complied with the Department of Defense Anti-terrorism Standards and achieved a Spirit Bronze Level of sustainable design features.

(Click for more photos)
Ranger Barracks Complex
Hunter Army Airfield, GA - 2007

Contract Amount - $36,870,514.00
Description- This project consisted of the construction of a barracks complex including barracks and a central heating plant. Supporting facilities included utilities; electric service; fire protection and alarm systems; storm drainage; parking; paving, walks, curbs and gutters; information systems; site improvements; and, connection to the existing Energy Monitoring and Control System (EMCS). After occupancy of the new barracks, two existing barracks were demolished

(Click for more photos)